UHS Hospital Sky Tower and Cup
Details:
Utilized Building Information Modeling (BIM) techniques to provide valued input during pre-construction planning and services including schedule development, constructability reviews, cost reduction assistance, sustainability study assistance, and equipment selection assistance. Provide all electrical construction for 1,000,000 square foot, 9-story, acute care tower including an emergency/trauma center with (53) treatment rooms, (10) trauma stations, (336) new beds along with (84) future beds, and (30) operating rooms. Project includes installation of normal power consisting of (2) 35 kV circuits; essential and emergency power consisting of (6) 2000 kW, 4160V, diesel emergency generators; UPS; lighting; and fire alarm including voice evacuation notification. The construction process is utilizing VELA field construction management software. This project is expected to obtain LEED 2.2 Gold designation at its completion.
Owner
University Health System
General Contractor
Zachry Construction
Amount
$84,000,000.00
