Texas A&M SA Science & Technology Building

Details:

Electrical construction of 168,000 sqft three floor Science and Technology Building which contains science labs, classrooms, computer labs and department offices. Power is brought to the building through the new 15kV 4-way primary switch, 2000kVA primary transformer and the 3000A MDP. Emergency power is fed from the 800kW generator which can be tested with the 400kW load bank. Systems include lightning protection and fire alarm. Conduit for Comm, Security and A/V systems is also being installed. This was a full 3D modeled project with clash detection and coordination with all trades. The model was used to gain Trimble points for layout and prefab of feeder conduits, wall rough-in and overhead racks.

Owner

Texas A&M University

General Contractor

SpawGlass Contractors, Inc.

Amount

$6,392,772.00