× San Antonio: 210-496-6888 Email:marketing@goalterman.com Austin: 512-836-3950 Email: marketing@goalterman.com
Select Page

Northside ISD Competitive Sports Gymnasium

Details:

Northside ISD Competitive Sports Gymnasium is an 88,000 sqft. facility with 2,500 spectator seats. Tasked to design and enhancement the existing A/V system. Includes the installation of (1) audio signal processor with BLU link and Dante communication. Included adding (6) 8-port network PoE switches with fiber SFP modules for the Dante audio system, adding (1) 24-port analog audio patch bay to allow all audio cables in one central location, added (1) wall-mounted punch-down block for intercom communication, added (1) 24×24-port matrix switcher, to bring all camera locations to a central location to allow the ability to send camera feeds to a Tri-Caster, as well as the big screen. Included installing (1) hardwired control panel and processor to allow for control from the administration location for sending and receiving camera feeds. Included all associated cabling, programming, and testing.

Owner

Northside Independent School District

Designers

Alterman (Juan Gomez & Jose Gomez)

General Contractor

Alterman Inc.

Amount

$212,056.00