Christus Santa Rosa Children’s Hospital
Details:
Project includes the Electrical Back Bone Riser Infrastructure for the CHRISTUS Children’s Hospital Phase One which will serve Phase 2 Electrical Finish-out. Also includes connection to the Existing Electrical Infrastructure in the facility to the New Electrical Equipment Gear Distribution, Transformers, ATS’s & Power Panels. In addition, Alterman installed exterior fixtures from top to bottom, that illuminate beautiful exterior hand-made panels from Germany, making it an iconic building in downtown San Antonio.
Owner
Christus Santa Rosa Children’s Hospital
General Contractor
Bartlett Cocke General Contractors
Amount
$2,000,000.00