Owner: San Antonio River Authority
General Contractor: Sundt Davila
Amount: $2,332,359.00
Flood Control to the San Pedro Creek with mini River Walk Finishes.
Electrical installation of the electrical service and power distribution for an improvement project for drainage and mini river walk application. This includes light poles, a large walking path, and general area lighting.